Chinese
Huayue Flooring Construction Method
Smooth and dry ground.
Cover moisture-proof paper, apply asphalt twice or three times to the folded moisture-proof paper 20 centimeters. The moisture-proof paper must be more than 10 centimeters,
The ground keel certainly must be dry. Plank surface should be paved damp-proof oilpaper, the interface is 20 centimetres and above foundation 10 centimetres.
The plywood above 9mm-15mm, keep 20mm space between two plywoods or cut into 60cm×120cm, must nail on the cement floor.
In the east and south humid area, two floors can not be too close lest floor will expand and out of shape. In the northeast and northwest, takes the nature joint.
No glue between floor and plywood, nail on the wall slantwise.
Apply the ozocerite to the floor directly after the floor installment finished, will make floor surface more polished.
Because the floor is natural material, so please strictly according to the above method work, and specialized technical constructor carries on work. If shape changed and other problems caused by wrong installment method, company would not be responsible to the loss.
   
Add: 8C-12, World Trade Department, No.2229, Yan'an Xilu, Shanghai
Tel:021-62360161 Fax:021-62360160
Shanghai Yuehua Wood Floor Co., Ltd. All rights reserved  |  Supported by :www.wood365.cn
 
 
4741