Flooring Construction Method |
| ● |
Smooth and dry ground. |
| ● |
Cover moisture-proof paper, apply asphalt
twice or three times to the folded moisture-proof
paper 20 centimeters. The moisture-proof paper
must be more than 10 centimeters, |
| ● |
The ground keel certainly must be dry. Plank
surface should be paved damp-proof oilpaper,
the interface is 20 centimetres and above
foundation 10 centimetres. |
| ● |
The plywood above 9mm-15mm, keep 20mm space
between two plywoods or cut into 60cm×120cm,
must nail on the cement floor. |
| ● |
In the east and south humid area, two floors
can not be too close lest floor will expand
and out of shape. In the northeast and northwest,
takes the nature joint. |
| ● |
No glue between floor and plywood, nail
on the wall slantwise. |
| ● |
Apply the ozocerite to the floor directly
after the floor installment finished, will
make floor surface more polished. |
| ● |
Because the floor is natural material, so
please strictly according to the above method
work, and specialized technical constructor
carries on work. If shape changed and other
problems caused by wrong installment method,
company would not be responsible to the loss. |
| |
|
|
|
|
|